Structure · high impact
A new die or mould is a one-off cost spread across the order. Existing structures carry none.
There is no single number — but there are seven levers that decide it. Structure and material move the unit price most; quantity moves it fastest.
A new die or mould is a one-off cost spread across the order. Existing structures carry none.
PU versus recycled PU versus leather is the largest swing per unit, before lining.
Flocked is the default; microfibre and moulded EVA add cost and add hand feel.
Screen print is cheapest, foil costs more, multi-colour foil on dark material costs most and needs the most sampling.
Setup costs are fixed, so unit price falls steeply from 100 to 1,000 and flattens after that.
Folding structures ship flat and can roughly halve freight per unit. DDP adds duty and clearance into the unit price.
Per-order reports are a fixed cost, not per-unit — and the item most often forgotten in a quote.
Fixed costs (tooling, sampling, reports, setup) divided by quantity, plus material, labour and finishing per unit, plus freight and terms.
Usually the quantity basis, whether tooling is included, or whether the material is the one you asked for. Ask each supplier to quote the same quantity and material, and to state whether tooling is one-off.
Per unit, usually yes. Per landed unit it often is not — a folding case ships flat and can carry roughly twice the units in the same volume.
If you are testing a colourway or a new market, take a stock structure with your logo on it. Custom structure only pays back once the volume is known.