Structural engineering
Hardness is a decision, not a default. Structure is set from three inputs: frame dimensions folded, how the product is displayed or shipped, and the target price. Drop and compression tests run before tooling, so a failure costs a sample rather than a container.
Sampling and colour
Colour is approved on a physical sample, not on screen. Pantone C / U / TCX are compared side by side in the actual material — a foil that reads correctly on white card goes hollow on dark PU. Photo and video review happens before the sample ships.
Capacity
Guangzhou Zengcheng and Dongguan Humen run in parallel at roughly 500,000 units per month combined. When one line is full, the order moves rather than waits — which matters most in the eight weeks before a launch.
Export compliance
BSCI for the factory; REACH, RoHS, California 65 and FSC for the material. Reports are issued per order, and third-party testing can run at a lab you nominate.