Structural engineeringBox structure and hardness set around the frame and the display method; drop and compression tests before tooling.

Eyeglass Case
Eyewear Tray
Bags & Accessories
Shopping Bag
Eyewear Box
Mirror
Set Packaging Solution
Client logo wall · to be replaced once permissions are confirmed
Structure, sampling, capacity and compliance in one line — you are not relaying messages between four suppliers.
Structural engineeringBox structure and hardness set around the frame and the display method; drop and compression tests before tooling.
Fast samplingColour compared on the sampling bench, Pantone C / U / TCX in three sets, so revisions stop early.
500k units per monthGuangzhou and Dongguan run in parallel; when one line is full the other absorbs the order.
Export complianceREACH / RoHS / California 65 / FSC documents travel with the goods; factory visits arranged on request.
Sampling, production, inspection and shipping are handled by one team, not four.






Background → problem → what changed → result. Client names and exact figures follow once permissions are confirmed.

Same outer dimensions when open, shipped flat — fewer cartons per unit than a rigid case.

Case, pouch, cloth and band moved onto one colour card and one schedule.

Positioned hot stamping with a re-cut die: first physical sample approved.
Certificates and test reports are issued per order and shared for your compliance file. The factory can be audited at any time; both plants can be toured by video.
View compliance documentsIcons show document categories. Current holder and expiry are on the compliance page.
MOQ, sampling, lead time, trade terms — written out, so it does not take an extra email.
Stock display programme from 100 pcs, handmade custom from 500 pcs, full custom with structure development from 5,000 pcs. The figure is per style per colour.
From 7 days after artwork and materials are confirmed. Sampling cost and lead time are quoted per project, and the credit policy against a bulk order is agreed case by case.
Usually around 90 days after sample approval, confirmed in the order. The date can move with factory scheduling; we tell you before it becomes a problem.
Yes. Material and finished-goods test reports ship with the order, and third-party testing can be arranged to your nominated lab.
Both. Export documentation is complete either way, and DDP is available for brands that want a landed cost per unit.
Yes. Both sites can be visited in person or toured by video call.
